Feasibility Study, ESIA and Detailed Engineering Design for the Lilongwe Old Airport – Kwanyanda - Santhe and Kwanyanda – Kasiya Spur Roads (96km) DBST - financed by Malawi Government

Prepared and submitted:

  • Inception Report
  • Topographic survey report
  • Draft Feasibility report including Draft Materials Report, Preliminary Design Report, and Draft Environmental Impact Assessment (ESIA) and Resettlement Action Plan (RAP)
  • Final Feasibility report including Materials Report, and Final ESIA and RAP
  • Draft Detailed Engineering Design and Draft Bidding Documents
  • Final Detailed Engineering Design, cost estimate and Final Bidding Documents

Feasibility Study, ESIA and Detailed Engineering Design for the Lilongwe Old Airport – Kwanyanda - Santhe and Kwanyanda – Kasiya Spur Roads (96km) DBST - financed by Malawi Government

Client The CEO, Roads Authority, Functional Building
Date February 2010 – June 2013
Category Feasibility Study
Country of Assignment Malawi
Value USD 0.77 million
Role Sole Consultant

BE SURE TO GET THE LASTEST EXCLUSIVES OFFERS, PRODUCT RELEASES AND SO MUCH MORE

Sign up and subscribe to our newsletter and get inspired every month