Prepared and submitted:
- Inception Report
- Topographic survey report
- Draft Feasibility report including Draft Materials Report, Preliminary Design Report, and Draft Environmental Impact Assessment (ESIA) and Resettlement Action Plan (RAP)
- Final Feasibility report including Materials Report, and Final ESIA and RAP
- Draft Detailed Engineering Design and Draft Bidding Documents
- Final Detailed Engineering Design, cost estimate and Final Bidding Documents
Feasibility Study, ESIA and Detailed Engineering Design for the Lilongwe Old Airport – Kwanyanda - Santhe and Kwanyanda – Kasiya Spur Roads (96km) DBST - financed by Malawi Government
Client
The CEO, Roads Authority, Functional Building
Date
February 2010 – June 2013
Category
Feasibility Study
Country of Assignment
Malawi
Value
USD 0.77 million
Role
Sole Consultant