Prepared and submitted:
- Inception Report
- Topographic survey report
- Draft Feasibility report including Draft Materials Report, Preliminary Design Report, and Draft Environmental Impact Assessment (ESIA) and Resettlement Action Plan (RAP)
- Final Feasibility report including Materials Report, and Final ESIA and RAP
- Draft Detailed Engineering Design and Draft Bidding Documents
- Final Detailed Engineering Design, cost estimate and Final Bidding Documents
Feasibility Study, ESIA and Detailed Engineering Design for the Upgrading of Likuni – Malingunde S124 (17.2km) Road to Bitumen Standard
Client
The CEO, Roads Authority, Functional Building
Date
February 2018 to October 2019
Category
Feasibility Study
Country of Assignment
Malawi
Value
USD0.14 million
Role
Sole Consultant