Feasibility Study, ESIA and Detailed Engineering Design for the Upgrading of Dzeleka – Mwangala – Ntchisi – Mpalo – Malomo M7/U51 (71km) Road to Bitumen Standard
Prepared and submitted: Inception Report Topographic survey report Draft Feasibility report including Draft Materials Report, Preliminary Design Report, and Draft Environmental Impact Assessment (ESIA) and Resettlement Action Plan (RAP) Final Feasibility report including Materials Report, and Final ESIA and RAP Draft Detailed Engineering Design and Draft Bidding